|
|
Contents
Chapter 1 Introduction............................................................................................................ 1-1
1.1 EIR Certification and Project Selection Process................................................... 1-1
1.2 Public Involvement................................................................................................ 1-2
1.3 Agency Approvals and Permits............................................................................ 1-2
1.4 Requirements for and Consideration of Recirculation........................................ 1-3
1.5 Responses to Comments........................................................................................ 1-4
Chapter 2
Responses to Comments...................................................................................... 2-1
2.1 Introduction........................................................................................................... 2-1
2.2 List of Commentors............................................................................................... 2-1
2.3 Responses to Comments........................................................................................ 2-1
Chapter
3 Text Revisions to EIR............................................................................................ 3-1
3.1 Revisions to the Executive Summary.................................................................... 3-1
3.2 Revisions to Chapter 2.......................................................................................... 3-1
3.3 Revisions to Chapter 3.......................................................................................... 3-5
3.4 Revisions to Chapter 4........................................................................................ 3-54
3.5 Revisions to Chapter 5........................................................................................ 3-56
Chapter 4 Draft St. Helena Mitigation Monitoring and Reporting Plan....................... 4-1
Chapter 5 References............................................................................................................... 5-1
Attachments
Attachment 1 ......... Comment
Letters
2_Dept of Fish and Game Sept 12 2003
3_Dept of Transportation Sept 15 2003
5_Vineyard Valley Homeowners Association Sept 2003
7_Living Rivers Council Sept 15 2003
8_T. Lippe Letter from S.Velyvis Sept 2003
9_Warren Young September 04 2003
10_Cheryl Olsen letter September 08 2003
11_Ferenc Brunner September 08 2003
12_Public Meeting Minutes August 19 2003
Attachment 2 ......... City of
Performance-Based Operation and Maintenance Manual for the
Enhanced Minimum Plan (Adaptive Management Plan)
Attachment
2 – Adaptive Management Plan
Attachment 3.......... Professional
Qualifications
Acronyms and Abbreviations
|
ABAG |
Association of Bay Area Governments |
|
ADT |
Average Daily Trips |
|
AF |
acre feet |
|
BAAQMD |
Bay Area Air Quality Management District |
|
BMP |
Best Management Practice |
|
CAA |
Clean Air Act |
|
CalOSHA |
|
|
CARB |
|
|
CCC |
|
|
CDC |
California Department of Conservation |
|
CDFG |
California Department of Fish and Game |
|
CEG |
Conditionally Exempt Generator |
|
CEQA |
|
|
CERCLA |
Comprehensive Environmental Response, Compensation,
and Liability Act |
|
CESA |
|
|
cfs |
cubic feet per second |
|
CNDDB |
|
|
CNEL |
Community Noise Equivalent Level |
|
Corps |
|
|
CRHR |
|
|
CWA |
Clean Water Act |
|
dB |
decibel |
|
DBA |
A-weighted decibel |
|
dbh |
diameter at breast height |
|
DEIR |
Draft Environmental Impact Report |
|
DOC |
Department of Commerce |
|
DOI |
Department of Interior |
|
DOT |
|
|
DTSC |
California Department of Toxic Substances
Control |
|
EFH |
Essential Fish Habitat |
|
EIR |
Environmental Impact Report |
|
EMP |
Enhanced Minimum Plan |
|
EPA |
Environmental Protection Agency |
|
ESA |
Endangered Species Act |
|
ESU |
Evolutionary Significant Unit |
|
FEMA |
Federal Emergency Management Agency |
|
FHWA |
|
|
FONR |
Friends of the |
|
FYLF |
Foothill Yellow-legged Frog |
|
gpm |
gallons per minute |
|
HMTA |
Hazardous Materials Transportation
Authority |
|
ldn |
day/night equivalent |
|
leq |
equivalent energy level |
|
LF |
linear feet |
|
LOS |
Level of Service |
|
LRP |
|
|
LWD |
Large Woody Debris |
|
MBTA |
Migratory Bird Treaty Act |
|
MP |
Minimum Plan |
|
m.s.l. |
Mean Sea Level |
|
NCCPA |
Natural Community Conservation Planning
Act |
|
NCCP |
Natural Community Conservation Plan |
|
NCFCD |
|
|
NFIP |
National Flood Insurance Program |
|
NGVD |
National Geodetic Vertical Datum |
|
NMFS |
National Marine Fisheries Service |
|
NOAA |
National Oceanic and Atmospheric
Administration |
|
NOx |
Nitrogen oxides |
|
NOP |
Notice of Preparation |
|
NPDES |
National Pollution Discharge Elimination
System |
|
NRCS |
Natural Resources Conservation Service |
|
NRHP |
National Register of Historic Places |
|
O&M |
Operation and Maintenance |
|
P/C, P/S |
Pre-cast, Pre-stressed |
|
PM10 |
Particulate Matter smaller than 10 microns |
|
RCP |
Reinforced Concrete Pipe |
|
RCRA |
Resource Conservation Recovery Act |
|
ROG |
Reactive Organic Gases |
|
SR |
State Route |
|
RSP |
rock slope protection |
|
RWQCB |
Regional Water Quality Control Board |
|
SARA |
Superfund Amendments and Reauthorization
Act |
|
SG |
Small Generator |
|
SH&G |
Swanson Hydrology and Geomorphology |
|
SHPO |
State Historic Preservation Officer |
|
SHUSD |
|
|
SWPPP |
Stormwater Pollution Prevention Plan |
|
SWRCB |
State Water Resources Control Board |
|
TAC |
Technical Advisory Committee |
|
TMDL |
Total Maximum Daily Load |
|
TSD |
Treatment, Storage and Disposal |
|
ULL |
Urban Limit Line |
|
USDA |
|
|
USFWS |
|
|
USGS |
|
|
UVDS |
|
|
VELB |
Valley Elderberry Longhorn Beetle |
|
VVMHP |
|
|
VVRP |
|
|
WQCP |
Water Quality Control Plan |
|
WSE |
Water Surface Elevation |
|
WWTP |
Wastewater Treatment Plant |